deterministic schedule
常见例句
- This makes the 2.6 scheduler an O(1) process because the time to schedule is both fixed and deterministic regardless of the number of active tasks.
这使得 2.6 版本的调度器成为一个复杂度为 O(1) 的过程,因为调度时间既是固定的,而且也不会受到活动任务个数的影响。 - To schedule deterministic pauses for GC, Metronome uses two different threads to achieve both consistent scheduling and short, uninterrupted pause times
为了给 GC 调度确定性暂停,Metronome 使用了以下两个不同的线程来完成一致性调度和短暂连续的暂停时间 - It is important to recognize, however, that CPM as a result of its deterministic nature would schedule projects only to the level of reliability of the input values of the duration of activities.
它是重要的是要承认,但是, CPM的,由于其性质确定性将如期项目不仅有利于水平的可靠程度,投入的价值观会期活动。 返回 deterministic schedule