resource leveling
常见例句
- This paper provides a Neural Network solution for resource leveling problem.
为有限资源均衡问题提供一个神经网络解决方法。 - For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.
对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。 - In the case of static analysis, most of the information is extracted from the model and used to analyze cost, time management, performance, process flow validity, and resource leveling.
在静态分析中,大多数信息是从模型中提取出来的,并用于分析消耗、时间管理、性能、流程有效性及资源水平。 返回 resource leveling